New Loads: DCs
¨Energy Is the battleground for AI supremacy"

The electrification of end uses is a key driver of the energy transition, replacing fossil fuels w/ low-carbon electricity. It reduces GHG emissions, improves energy efficiency, and boost industrial & economic digitalization. It also creates synergies with distributed energy resources (DERs), battery energy storage systems (BESS), demand response, and smart grids, enabling more flexible & resilient power systems.
In Brazil, new electricity loads grow across key sectors. In agribusiness, electric center pivots and agro-industrial processing expand DG opportunities. In urban areas, EVs drive demand for charging infra, while industrial heat pumps enable the electrification of low- & medium-temp. process heat, particularly in the F&B & pharmaceutical sectors. Concurrently, green H2 electrolyzers are emerging as major new loads, while AI hyperscale data centers create massive demand for clean, reliable power.
This page places particular emphasis on data centers, whose rapidly growing power demands are reshaping electricity infrastructure & investment priorities.
DATA CENTERS
Power-hungry data centers
Data centers (DCs) are emerging as a major new source of electricity demand, driven by cloud computing, digital services, and the expansion of AI. According to the IIEA, global DC´s electricity consumption reached ~415 TWh in 2024 (1.5% of worldwide electricity use), and is projected to more than double to around 945 TWh by 2030 [IEA, 2024]. Unlike other loads, DCs operate continuously, with a flat load profile, consuming 80–85% of their rated power capacity. Beyond its scale, this demand's geo-concentration challenges grids, requiring heavy power system investments. For Brazil, accommodating this growth while leveraging its REN resources will challenge electricity system planning.
Evolution of DCs: from web servers to AI hyperscale
DCs have evolved alongside the growth of digital tech. Early facilities primarily hosted web servers & enterprise applications; later, HPC (high-perf. computing) expanded demand for intensive scientific and engineering calculations. Today, the rapid development of artificial intelligence, particularly the training and operation of Large Language Models (LLMs), is driving demand for specialized computing infra based on GPUs and other AI accelerators. This evolution has also accelerated the growth of hyperscale DCs: very large facilities, operated by major cloud or tech companies, designed to support massive computing capacity, extensive storage, and highly scalable digital services.
Components, IT loads, power density & PUE
Modern DCs rely on three main types of processors. CPUs are general-purpose processors that manage operating systems and a wide range of computing tasks. GPUs (graphics processing units) handle many calculations simultaneously, making them particularly effective for AI training and high-performance computing. TPUs (tensor processing units) are specialized processors designed to accelerate AI workloads, particularly neural networks. As AI adoption expands, the growing use of GPUs & TPUs increases computing power reqs and, consequently, the electricity demand and heat generated by DCs.
Another important consideration is memory, which plays a critical role in DC´s performance, particularly in AI workloads. DRAM is widely used as the main memory in servers, providing fast, temporary storage for data and programs being processed by CPUs. HBM (high bandwidth memory), by contrast, is a specialized DRAM stacked vertically next to GPUs. Its higher data BW enables large volumes of data to move rapidly btw memory & processors, reducing delays during AI train-infer. HBM is a high-perf., high-cost memory tech used in advanced AI accelerators. Samsung & SK hynix (South Korea), Micron (U.S.), and CXMT (China) lead DRAM production, with the first three also supplying HBM, led by SK hynix.
Nvidia leads the AI GPU market, supported not only by its HW but also by its CUDA ecosystem, a suite of devtools, libraries, and frameworks that enables efficient GPU computing and creates a strong competitive advantage. AMD challenges this position with its AI- and HPC-focused Instinct accelerators, while tech giants such as Google & Amazon build custom chips for their specialized workloads.
These processors directly affects DCs’ IT loads & pwr density: DC’s IT load is the electricity consumed by servers, GPUs, storage, and networking eqpt. IT load is the electricity consumed by servers, GPUs, storage, and networking equipment, excluding cooling and supporting infra. According to Enerdata, IT pwr density rose from ~2 kW/m² to >20 kW/m² over the past decade. While standard racks require <20 kW, advanced AI systems reach up to 250 kW per rack, requiring high-capacity power & liquid cooling [Enerdata, 2026]. Figure 1 details the rising power density of processors and racks under AI workloads.
Another key efficiency indicator is Power Usage Effectiveness (PUE), defined as the ratio of a data center’s total facility energy consumption to the energy consumed by its IT equipment. A PUE of 1.0 represents the theoretical ideal, while a PUE of 1.3 means that for every 1 kWh consumed by IT equipment, the facility uses an additional 0.3 kWh for cooling and support systems. Lower PUE values indicate more efficient infrastructure, although the metric does not measure IT computational efficiency.
Cooling techs: from air to liquid
DCs traditionally rely on air cooling, using fans, air-handling units and chillers to remove heat from servers. Hot- and cold-aisle containment improves airflow mgnt and reduces energy consumption. For higher-density installations, hybrid cooling combines air w/ liquid-based systems, including rear-door heat exchangers that capture heat at the rack. Direct-to-chip (D2C) cooling uses cold plates on processors, while immersion cooling submerges servers in non-conductive fluid.
As AI workloads drive rack power densities beyond the practical limits of conventional air cooling, liquid cooling is becoming increasingly important in AI DCs. D2C solutions are gaining traction, while immersion cooling offers an alternative for particularly applications. These systems circulate coolant in closed loops, minimizing water consumption, though heat-rejection systems like cooling towers still require water. The trend is toward high-density, AI-ready facilities that integrate advanced thermal mgmt, energy efficiency, and waste-heat recovery. TrendForce projects liquid cooling's share of AI chips to jump from ~33% in 2025 to 53% in 2026, underscoring its growth.
Tier classification
Uptime Institute’s Tiers I–IV classify DC reliability based on redundancy, maintainability, & fault tolerance:
-
Tier I — Basic Capacity: basic infrastructure w/ limited redundancy; maintenance or eqpt failures may interrupt IT operation.
-
Tier II — Redundant Capacity: redundant power/cooling components; distribution failures can still disrupt IT operation.
-
Tier III — Concurrently Maintainable: redundant distribution paths & components allow planned maintenance without IT downtime.
-
Tier IV — Fault Tolerant: independent, physically separated systems prevent a single equipment failure or path interruption from affecting IT operations.
Higher Tiers demand more infra investment: optimal level depends on uptime reqs & business goals.
Digital Sovereignty: beyond DC´s location
Digital sovereignty goes beyond the physical location of a DC. Hosting infrastructure in Brazil does not automatically mean that Brazil controls the data processed within it. Three dimensions apply: territorial sovereignty, whereby equipment is located within BR territory; legal sovereignty, whereby operations are subject to BR laws, including the General Data Protection Law (LGPD), even when the controlling company is foreign; and operational & technological sovereignty, which concerns who controls the servers, SW, adm credentials, encryption keys, and access to or transfer of data. True sovereignty depends not just on storage location, but on who controls the infra, tech, and data governance.
BRAZIL’S DC LANDSCAPE
Brazil has approximately 200 DCs, compared w/ more than 5,400 in the U.S., highlighting the substantial difference in scale btw the two markets. Nevertheless, Brazil is one of Latin America’s leading digital infrastructure hubs, supported by its large economy, expanding cloud computing demand, REN energy resources, and growing interest in artificial intelligence (AI). These figures are based on Cloudscene data reported in Stanford University’s AI Index Report 2026 and may vary according to the definition and coverage of DCs [Stanford, 2026].
Located in São Paulo state, Ascenty’s Vinhedo DC Campus illustrates the scale of investment in BR’s digital infra. Phase one reportedly cost BRL 500M, spanning ~40,000 m² and 27 MW at Vinhedo 1, though earlier statements cited 40 MVA across five buildings. Vinhedo 2, opened in 2020, received a further USD 150M investment. Together, the two facilities provide about 46,000 m² of combined area and around 7,300 racks. Ascenty has reported a combined capacity of 36 MW, although published figures vary across company materials. Figure 2 shows Vinhedo's DC, located at São Paulo, while Figure 3 maps the geographic footprint of data centers in Brazil alongside Western Europe.
Ceará: Brazil’s emerging AI DC superhub
The Omnia Data Centers project, developed in partnership w/ Casa dos Ventos to serve ByteDance (TikTok), is under construction at the Pecém Industrial and Port Complex in Ceará. The initial phase is designed for 200 MW of IT capacity, with at least 40 MW expected to become operational by Q3 2027. The broader campus could eventually reach 1 GW. Ceará offers two key advantages: Fortaleza handles roughly 95% of Brazil’s submarine fibre-optic connections, and the state has substantial wind & solar resources. However, environmental licensing issues remain a potential risk to the operational timeline.
Brazil’s National High-Performance Computing Network (SINAPAD)
Brazil’s National System for High-Performance Computing (SINAPAD), under the Ministry of Science, Technology and Innovation (MCTI), connects specialized computing centers (CENAPADs) nationwide. Coordinated by the National Laboratory for Scientific Computing (LNCC), home to the Santos Dumont supercomputer, the network provides researchers with access to high-performance computing (HPC), data storage, and advanced scientific computing resources. While national hubs like LNCC host multi-MW systems, individual regional facilities generally operate under 1–2 MW.
The network includes major academic and research institutions such as UNICAMP, UFRGS, UFMG, UFC, UFRJ, and INPE. In August 2026, MCTI designated the Laboratory of Computing of Central Brazil (LAMCAD) at the UFG as a CENAPAD, subject to an integration plan to meet full network requirements. UFG’s inclusion expands advanced computing capacity in Brazil’s Central-West, supporting R&D in agribusiness, energy, environmental monitoring, and AI.
Brazil’s Artificial Intelligence Plan - PBIA
As demand for AI and high-performance computing grows, DCs are becoming increasingly important to Brazil’s digital economy. Their expansion will depend not only on investment and connectivity, but also on reliable power supply, energy efficiency and access to low-carbon electricity.
Against this backdrop, Brazil’s Artificial Intelligence Plan (PBIA) 2024–2028 foresees about BRL 23B in investments to develop national AI capabilities, expand high-performance computing infrastructure, train skilled professionals and promote technological sovereignty. By encouraging domestic AI development and advanced computing infrastructure, the plan could strengthen Brazil’s position as a regional AI hub while increasing demand for DCs and reliable, low-carbon electricity [MCTI, 2026].
Figure 1: Evolution of processor & rack power density

Source: Author, 2026
Figure 2: Vinhedo's data center, São Paulo

Figure 3: Geographic locations of Brazil’s (L) & Western Europe´s (R) DCs